1907 Queen Anne House Painting
[SlideDeck2 id=2825]
This 1907 Built Queen Anne House required 70 hours of carpentry repair and wood repairs before painting. The west elevation needed scaffolding so carpenters and painters could safely access all siding and trim for repairs and painting. A 15 year old IPE deck was cleaned and treated with a clear penetrating sealant Daly’s Ship and Shore.
Read the home owners review written for Shearer Painting on Angie’s list
Shearer was familiar with this home from two previous interior painting projects over the last eight years. The owners previous exterior painting project had taken five months to complete; so timely completion was important to the owners. Careful planning, adequate manpower and a separate carpentry crew allowed this project to conclude in less than two months. Scaffolding costs (billed by first month then daily as an industry practice) are always a consideration so the Shearer project managers advocated for the repairs, prep, and painting to be completed as efficiently as possible without sacrificing quality or safety.
RenuSingh says:
A good painter always do his work skillfully and ofcourse timely completion of work is required. I know a very good painting contractor in gurgaon. For more info visit the site http://www.pearlwallscapes.com
MichaelOSheaPaintingInc says:
Great work! This looks like a great project to work on.
We are located over in the North East in New York. East Hampton Long Island to be exact and do renovations like these most of the time. Most of the houses out here are form the same time period.
Pictures look awesome and I bet there was a lot of work. The blog looks great too. Steady stokin you guys!
http://www.michaelosheapainting.com
http://www.paintingcontractoreasthamptonny.us
http://www.housepaintingeasthamptonny.us