Painting Exterior in January

February 2, 2012

low-temperature-paint

low-temperature-paint

Exterior house painting project Seattle. Painting project had been abandoned by previous painting contractor. Low temperature paints were used on this project. Started Jan 8th, 20120 completed Feb 2, 2012. The previous contractor had started primimng and painting before completing the appropriate surface prep. We removed the new primer, paint, and existing failing paint. The bad & incomplete work needed to be corrected and this added a significant cost to the project; this could have been avoided if the prep and priming work had been completed properly the first time.

Learn more about low temperature paint.

Learn more about exterior surface preparation